Skip to Content

Blog Archives

Los Angeles State Historic Park

1245 N. Spring Street

Los Angeles, CA  90012

California State Parks

Start Date: N/A

End Date: N/A

Awarded Amount: N/A

Opened on April 22, 2017.

Los Angeles State Historic Park (LASHP) is a California Department of Parks and Recreation project that is 32 acres of open space where visitors can enjoy a view of Downtown LA while they walk through its trails. Uniquely located in the heart of Los Angeles, it is surrounded by Chinatown, Little Tokyo, and Mission Junction.

For more information on LASHP please click here.

READ MORE

Malibu Lagoon State Beach

23200 Pacific Coast Highway

Malibu, CA 90265

California Department of Parks and Recreation

Start Date: 10/6/2004

End Date: 12/31/17 (Estimated Completion)

Awarded Amount: $4,923,600

Stage: In progress.

There’s something for everyone at Malibu Lagoon State Beach: scenic trails, historic museums, salt water fishing at the pier and wildlife viewing. For water enthusiasts you’ll find some of the best waves at the world famous Surfrider Beach. Come low tide to explore tide pools or anytime for swimming, snorkeling, scuba diving and boating.

A leisure two-mile loop trail will take you around the lagoon, through tide pools and on to Malibu Pier. At the pier you’ll find beach equipment rentals, harbor tours, restaurants and a surf museum. Grab a bite at the pier or picnic on the beach. On the way back visit the Malibu Lagoon Museum or check out guided tours of the historic Adamson House.

Grant funding was provided for the pier and the newly restored lagoon. In addition, the City of Malibu completed a Stormwater project in 2011 to protect Santa Monica Bay from hazardous material spills and pollution.

READ MORE

Agoura Hills Recreation Center

29900 Ladyface Court

Agoura Hills, CA 91301

City of Agoura Hills

Start Date: 9/30/2014

End Date: 12/31/17 (projected end date)

Awarded Amount: $750,000

Stage: In Progress…

The Agoura Hills Recreation & Event Center is open to the general public for a variety of programs and activities. The building serves as the new home for City of Agoura Hills’ Community Services staff as well as the Cultural Arts Council. In addition, there is a dedicated space for Senior Citizen programs and classes and a state of the art Teen Center, just to name a few things!

Grant funding was provided for the construction of the recreation center and the new outdoor education/interpretive center. More grant funding is being provided for the construction of a new trailhead and trail from the Recreation Center to connect to existing trails in the surrounding Santa Monica Mountains National Recreation Area and the regional trail system.

READ MORE

Vincent Lugo Park

300 W. Wells Street

San Gabriel, CA 91778

City of San Gabriel

Start Date: 10/18/2016

End Date: 12/31/2017

Awarded Amount: $110,000

Stage: In Progress

Vincent Lugo Park grounds include lighted youth baseball diamond, youth multi-purpose athletic field, Laguna de San Gabriel Nautical (Dinosaur) Playground, picnic tables, barbecues, multipurpose trails, pedestrian bridges, restrooms and the Girl Scout House.  The current project involves the development of a new play area and the installation of fitness equipment at the park.

Vincent Lugo Park

READ MORE

Horsethief Canyon Park

301 Horsethief Canyon Rd.

San Dimas, CA 91773

City of San Dimas

Start Date: 11/3/1992

End Date: 11/8/2012

Awarded Amount: $1,690,000

Stage: Completed!

Horsethief Canyon Park is a 50 acre park which includes a small and large dog park, play equipment, shade shelter, restrooms, picnic tables, benches, soccer fields, hiking trails and protected wilderness horse trails.

Grant funding was used for the development of Horsethief Canyon Park. Development included construction of soccer fields, a picnic area, a tot lot, volleyball & horseshoe courts, as well as wildlife corridor enhancement and construction of a nature trail, restroom, and other infrastructure improvements.

Grant funding was also used for the construction of additional multi-use trails in Horsethief Canyon Park which helped improve circulation and accessibility in the Park.

Finally, funding was used for the widening and clearing of the Poison Oak Trail and construction of a hilltop picnic area which included installation of picnic tables, benches, hitching posts and the planting of trees.

READ MORE

Allendale Park Lighting Project

Installation of field lighting equipment including new poles and light fixtures, wires and conduit, switchgear and breakers, a new equipment cabinet and the addition of computer controlled programming equipment.

READ MORE

Playground Renovations at Eddie Park

Replacement and rehabilitation of playground equipment at Eddie Park.

READ MORE

Sports Field and Reconstruction at Hamilton Park

The project includes, but is not limited to, drainage improvements to the Multi-Purpose Sports Field. Reconstruction of playground.

READ MORE

Kenneth Hahn State Recreation Area

This project is being completed in multiple phases and includes the following:
Replacement of existing shade structures with new prefabricated shade shelters as well as upgrades to walking paths and concrete pads. Expansion of the the existing parking lot at the Kenneth Hahn State Recreation Area Soccer Complex to accommodate an additional 36 parking spaces.

READ MORE