Skip to Content

Blog Archives

San Rafael Park

Improvements to the playground, including: construction of a shade arbor and walk; construction of a wrought iron fence; relocation of a drinking fountain; installation of four new benches; construction of a concrete seat-wall at the play equipment area;

READ MORE

Memorial Park

Expansion of the Pasadena Senior Center facility in Memorial Park. Final phase of the Memorial Park Senior Center to include: addition of building facade and cabling for the security, computer, and telephone systems.

READ MORE

Chittick Field Sports Complex & Field Improvements

Redevelopment of existing park space within a Los Angeles County Flood Control district basin in central Long Beach. Improvements also included a football field, running track, parking lot, restroom, ADA access, landscaping, irrigation, utilities, demolition and fencing. Retrofitting of two softball lighting systems.

READ MORE

Belvedere Park

This project is being completed in multiple phases and includes the following:
Restroom and gymnasium improvements including design services, contract construction and repairs. Irrigation renovations, ADA access improvements, ballfield grading and drainage, gymnasium restroom refurbishment, new picnic shelters, concrete walkway repairs, new handball courts, and parking lot re-pavement…

READ MORE

Vasquez Rocks Park Interpretive Center

This project was completed in several phases and included the following:
Acquisition of open space land at Vasquez Rocks. Development of a nature center/museum and general improvements to the Vasquez Rocks Regional Park. The purchase and installation of new picnic shelters, benches, tables, concrete paving, fencing, lighting, and signage at Mary Van Dyke Park…

READ MORE

South Coast Botanic Garden

The project includes: -refurbishment of general building and site improvements, -demolition of two restrooms and construction of one new restroom, -structural modifications to the administration building, -construction of a new Japanese garden trellis, -removal and installation of fencing materials, -replacement of termite-infested sections of a trellis, -regrading/repaving of the existing parking lot, -replacement of a lighting standard in the main parking lot, -installation of new lighting standards at Upper Meadows and Children’s Garden…

READ MORE